Subject: 
080151107
NEXUS Gas Transmission, LLC (U.S.)
Not a critical notice
10/12/2021
07:35:13 AM
01/10/2022
07:35:13 AM
113221
Supersede
Planned Service Outage
10/12/2021
07:35:13 AM
113052

No response required


NEXUS Outage Schedule -- UPDATE


Notice Text:

NXUS Outages

Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the NEXUS Gas Transmission, LLC (NXUS) system.  Due to unforeseen delays or scheduling conflicts, the dates of the outages listed below are subject to change.  In addition, this schedule is not a complete list of all outages that will occur this outage season, and we reserve the right to update this list to reflect additional major outages when the timing of such major outages can be reasonably forecasted.  Any changes to the list below will be posted at the earliest practical date.  Parties are urged to monitor these postings to access the most current information.

 

NXUS Operational Capacity Matrix:

Below is an operational capacity matrix of anticipated NXUS mainline capacities based on major outages know to date that will affect the mainline capacity on the NXUS system for the outage season.  Due to unforeseen delays or scheduling conflicts, the dates and capacities listed below are subject to change.  In addition, this matrix may not be a complete list of all capacities based on major outages that will occur this outage season and we reserve the right to update this list to reflect additional capacity reductions based on major outages when the timing of such major outages can be reasonably forecasted. Any changes to the matrix below will be posted at the earliest practical date.

 

Colerain

Salineville

Hanoverton

Wadsworth

Clyde

Waterville

11-Oct

950

950

950

947

929

879

12-Oct (1)

763

763

860

857

839

789

13-Oct

882

882

882

878

860

810

14-Oct

444

444

872

869

851

801

15-Oct

882

882

882

878

860

810

16-Oct

882

882

882

878

860

810

17-Oct

882

882

882

878

860

810

18-Oct

882

882

882

878

860

810

19-Oct

830

830

855

852

834

784

20-Oct

950

950

950

790

775

725

21-Oct

521

521

813

809

791

741

22-Oct

882

882

882

878

860

810

23-Oct

882

882

882

878

860

810

24-Oct

882

882

882

878

860

810

25-Oct

950

950

896

896

881

831

26-Oct - 31-Oct

950

950

1,261

1,257

1,238

1,188

Nov 1 forward

950

950

1,473

1,471

1,453

1,403

Capacity Matrix Footnote:

(1) Nexus will work with upstream point operators at Colerain and Salineville to minimize operational impacts.


NXUS Compressor Station Outages:

NXUS will be conducting outages at the following compressor stations.  Please refer to the operational capacity matrix above for capacity impacts during each of the following outages:

 

Compressor Station Outages:

 

Begin

End

Station

Oct 1

Oct 31

Hanoverton(1)

Nov 1

Nov 5

Salineville

 

Compressor Station Outages Footnote:

(1) In addition, NEXUS anticipates the operating pressure on the suction side of the Hanoverton compressor station to be approximately 800 psig during the Hanoverton outage.  Based on historical and anticipated pressures from MR N2001 (TGP) being lower than 800 psig, NEXUS will be required to reduced scheduled quantities from TGP to -0- beginning October 1st.

NXUS DOT Pipeline Integrity Project

 

Tool Runs:

As part of NXUS's comprehensive integrity assessment of its pipeline system NXUS will be conducting cleaning and in-line inspection tool runs on various lines throughout its system.  As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity.  Should any of these investigations lead to a reduction of capacity, NXUS will post on the bulletin board as soon as it is known. 

 

NXUS utilizes specific ILI tools designed by vendors to inspect for a certain type of threat that may exist on the pipeline.  Depending on the type of the tool and in order to successful collect the data, the tool may need to be run a specific speed which determines the impact on pipeline capacity during the run.  Furthermore, each tool has a different size and length depending on the tool type and vendor.  Launcher and receivers, and other pipeline facilities may need to be modified in order to launch, receive and run the tool along the pipeline to ensure a successful run.  Occasionally, combination tools, which are tools utilized to investigate multiple threats simultaneously, do exist for various pipe sizes and vendors.  Since combinations do not exist for every pipe size or threat, there may be multiple tool runs needed for a particular segment which creates variability in the outage schedule timeframes.  The following list contains the more common tool types NXUS utilizes and associated threat that the tool generally inspects the pipeline for.  This is not an exhaustive list and there may be other exceptions for the types of threat each tool type looks for.

 

MFL-A

Internal/External Corrosion

Inertial Mapping Unit or IMU

Geohazard/Pipe Strain

Caliper

Dents/Obstructions

EMAT

Stress Corrosion Cracking

MFL-C

Selective Seam Weld Corrosion

MFL-HS

Hard Spots

 

Listed below are the pipeline segments scheduled for cleaning and/or in-line inspection this year which will have an impact on operational capacity.  Please refer to the operational capacity matrix for any mainline capacity impacts.  Inspections which have meter impacts and/or other operational impacts are denoted with a footnote reference and details of the impacts are in the details below.

 

 

Pipeline Section:

Type

 

Cleaner Date:

Caliper Date:

ILI Date:

Results / Potential Repair Date:

Line 73 Clarington to Colerain (1)

 

10/12

10/19

 

TBD

Colerain to Salineville (1)

 

10/14

10/21

 

12/25

Salineville to Kensington (1)

 

 

10/14


10/21

 


12/25

Hanoverton to Wadsworth

 

10/19

 

 

 

Wadsworth - Waterville (2)

 

10/20

 

 

 

Waterville - EOLN

 

10/21

Complete

 

TBD September

 

Tool Run Footnotes:

 

(1)           NEXUS has been informed by Texas Eastern (TE) of the following pipeline outage that will impact receipts into NEXUS:

Clarington to Kensington 30" Line 73
Caliper Tool Run:  10/19, 10/21
Tool Run Results/ Potential Repairs: TBD

As part of TE's comprehensive integrity assessment of its pipeline system, TE will conduct an in-line inspection tool run on its Colerain Station to Kensington 30" Line 73.

During the caliper tool runs the following meter will be reduce to flow rate of approximately 250,000 Dth /d for four to six hours:

 

                74202 - ACCESS MIDSTREAM HIGHWAY 219 - JEFFERSON CO., OH


Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

74201 - ACCESS MIDSTREAM CLARKS MILL ROAD-JEFFERSON CO.,OH
74202 - ACCESS MIDSTREAM HIGHWAY 219 - JEFFERSON CO., OH
74203 - DOMINION ENERGY TRANSMISSION, INC - CLARKS MILL,JEFFE

In addition, if isolation is necessary, worst case scenarios are as follows:

A.  Customers sourcing gas from meters South of Colerain Station, including TE's Mainline delivering to meters North of Colerain Station, including deliveries to NEXUS, will be reduced to 0 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services.

B.  Customers sourcing gas from North of Kensington, including NEXUS for deliveries to meters South of Kensington, including TE's mainline, will be reduced to 0 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services.

 

(2)            During this tool run meter MR N2002 - NEXUS/KENSINGTON will be unavailable for flow.

 


 

Pipeline Outages:

Below is a list of potentially impactful mainline outages occurring on the NXUS system this year.  Capacity impacts associated with these outages are reflected in the capacity matrix above

 

 

N4219 (DTE) Ypsilanti: October 8 - 30, 2021

 

Nexus has been informed by DTE of pipeline maintenance occurring on their E Line segment downstream of Milford Junction and north of its interconnect with Nexus-Ypsilanti which will impact NEXUS shippers lease capacity. Depending on the level of nominations through this segment DTE may have to restrict volumes which could include the Ypsilanti interconnect.

 

During the period October 8-30, 2021 all DTE meters north of Milford Junction listed below will be unavailable for flow:

 

N4310 - (DTE) DTE - Gas Storage W10 - POOL RECEIPT

N4440 - (DTE) DTE - Gas Storage - RECEIPT

N4140 - (DTE) DTE - Gas Storage - DELIVERY

N4311 - (DTE) DTE - Bluewater - POOL RECEIPT

N4206 - (DTE) DTE - Bluewater - RECEIPT

N4406 - (DTE) DTE - Bluewater - DELIVERY

N4308 - (DTE) DTE - Vector-Belle River - POOL RECEIPT

N4136 - (DTE) DTE - Vector- Belle River - RECEIPT

N4436 - (DTE) DTE - Vector-Belle River - DELIVERY

N4301 - (DTE) DTE - Great Lakes-Belle River - POOL RECEIPT

N4002 - (DTE) DTE - Great Lakes-Belle River - RECEIPT

N4422 - (DTE) DTE - Great Lakes-Belle River - DELIVERY

N4196 - (DTE) DTE - Willow-MCGC Trading Point

N4459 - (DTE) DTE - Union St. Clair- POOL RECEIPT

N4435 - (DTE) DTE - Union St. Clair - RECEIPT

N4035 - (DTE) DTE - Union St. Clair - DELIVERY

 

 

DTE-Milford Junction

Due to DTE maintenance, NEXUS's total capacity to Milford Junction N4237 (DTE) Vector Milford Junction - DEL will be 675,523 Dth/d. No additional volumes (flowing on a secondary basis) will be allowed.

 

Vector St. Clair Segment 

Due to DTE maintenance, NEXUS capacity to N4ST1 (VEC) St. Clair (US) will be reduced from 455,000 Dth/d to 130,000 Dth/d.

               

                                 

 


 

Scheduled Investigations:

As a result of NXUS's comprehensive integrity assessment of its pipeline system, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity.  Please refer to the NXUS Operational Capacity Matrix for mainline capacity impacts:

 

From

To

Line, VS

Begin

End

N/A

N/A

N/A

N/A

N/A

 




Download File: NEXUS Outage Schedule.pdf
Download File: NEXUS Major Outage Overview.pdf